Solving problems and making sure our clients pumps are running perfectly is what we do 7 days a week!Â
One of our engineers was called out to a racecourse due to the old controls failing on a booster. It was vital a solution was found as the booster set served the hot and cold water in the jockey and hospitality area.Â
Both inverters are now obsolete and controls dated, which meant we were unable to find a quick fix…however, we loaned and fitted the client with a temporary inverter to get their water supply back on whilst we found a permanent solution.
The fix…
Our engineer measured and sized up a booster which would best serve what they required on site. On our return we supplied and fitted the new boosters.Â
Full mechanical and electrical works were carried out by our engineer.Â
Always finding solutions for our clients…it’s what we do!Â