Out with the old and in with the new
We were recently called upon to upgrade a booster set at a country club. The old one had a faulty panel which was keeping the pumps running non-stop – far from ideal.
Our team sized up the situation, spec’d out a booster set that would be a perfect fit, and it wasn’t long before it was up and running. Time was of the essence, but no challenge is too great for our engineers.
Working alongside a helpful contractor, the new booster set was swiftly installed. Commissioned and back on track, the country club was ready to provide uninterrupted services to its members once again.
Just another demonstration of how we deliver efficient and effective solutions for our clients.
For all enquiries, contact us at:
0116 3735496
info@ntclokepumpsandwater.co.uk
www.ntclokepumpsandwater.co.uk
Supporting clients across the UK.