Seal Change at a Busy Student Block in Leeds- With Minimal Disruption
Â
Called to a bustling student residence in Leeds, we took on the challenge of a seal change for a Grundfos unit. With the high demand on the 18.5kw set, it was crucial the booster remained operational throughout the task.Â
Â
A challenge for some, but for us? Standard procedure.
Â
We isolated the leaking pump, swapped out the old seal for the new, and carried out a comprehensive service on the unit, ensuring it was primed and ready for the system.
Â
Our commitment:
Delivering top-notch services with minimal disruption. With NT Cloke Pumps & Water, your peace of mind is always at the forefront.
Â
In need of a trusted partner for your pump requirements?