Case Studies

16 Nov
After an emergency call-out for loss of water supply at a Birmingham apartment block, NT Cloke Pumps & Water installed a temporary bypass to keep
11 Nov
NT Cloke Pumps & Water cleaned and chlorinated the cold water storage tank at a commercial office building in South West London, removing sediment, disinfecting
11 Nov
NT Cloke Pumps & Water replaced an obsolete, repeatedly faulting control panel on a three-pump booster set at a Frimley apartment block. A new NTC
08 Oct
NT Cloke Pumps & Water completed a twin booster pump replacement, installing two new Grundfos vertical multistage pumps. The project included removal of the existing
06 Oct
NT Cloke Pumps & Water replaced a continuously running booster pump with a modern DAB twin booster system at a country house. Our engineers also
02 Oct
NT Cloke Pumps & Water successfully repaired a failed booster pump by replacing its motor and mechanical seal. Discover how our engineers restored the existing
24 Sep
NT Cloke Pumps & Water completed cold water storage tank cleaning, chlorination and booster pump servicing at a residential apartment block in Coventry, supporting water
22 Sep
NT Cloke Pumps & Water completed rainwater harvesting system maintenance at an industrial factory in Liverpool, including tank cleaning, sediment removal, chlorination and booster equipment
17 Sep
NT Cloke Pumps & Water completed comprehensive cold water storage tank cleaning and chlorination at a Nottingham healthcare facility, removing accumulated staining and deposits to
16 Sep
NT Cloke Pumps & Water completed routine servicing of a twin pump cold water booster set at a Central London healthcare facility, helping maintain reliable
11 Sep
During a scheduled cold water storage tank clean and chlorination, NT Cloke engineers identified a heavily corroded and broken inlet float valve. A temporary repair
08 Sep
During routine servicing at a Leicester city centre apartment block, NT Cloke Pumps & Water identified a failed non-return valve within a twin cold water