Booster Set Upgrade – University of Bristol
Location: Bristol
Client: University of Bristol
Service: Booster Set Upgrade & Inverter Replacement
Sector: Commercial / Education
The Challenge
We were called out to the University of Bristol following a booster set failure affecting system performance.
Upon inspection, it became clear the issue was with the existing inverters, which were 15–20 years old and had reached the end of their operational life.
Continuing to repair ageing components would have resulted in ongoing reliability issues and increased downtime.
Our Solution
Rather than applying a temporary fix, we carried out a full inverter upgrade, bringing the booster set up to modern standards.
This ensures improved performance, better efficiency, and long-term reliability for the system.
Works Carried Out
✔ Diagnosed inverter failure on site
✔ Isolated and removed outdated inverter units
✔ Installed new, high-efficiency inverter drives
✔ Rewired and integrated with existing booster system
✔ Fully tested and recommissioned system
✔ Verified performance and system stability
The Result
A complete upgrade that restored functionality and improved system performance across the board.
✔ System fully operational
✔ Improved efficiency and control
✔ Reduced risk of breakdowns
✔ Future-proofed system for long-term use
Why Upgrade Instead of Repair?
When equipment reaches 15–20+ years old, repairs can become:
- Costly and frequent
- Inefficient in performance
- Unreliable in critical environments
Upgrading key components like inverters ensures:
- Better energy efficiency
- Improved system control
- Long-term reliability
📞 0116 373 5496
📧 info@ntclokepumpsandwater.co.uk
🌐 www.ntclokepumpsandwater.co.uk
You may also like
Location: Residential PropertyService: Tank Cleaning, Chlorination & Booster Set ServiceSector: Domestic The Challenge We were called to a residential property
Location: BirminghamService: Circulator Pump ReplacementSector: Commercial / Hotel The Challenge We were called to a hotel in Birmingham experiencing reduced
Location: Birmingham City CentreService: Booster Set UpgradeSector: Residential Apartment Block The Challenge We were called to an apartment block in
Location: Rural Property, ChippenhamService: Tank Cleaning, Chlorination & Booster Set ServiceSector: Domestic / Rural Water System The Challenge We attended
Location: Rural Property / FarmhouseService: Pump Installation & Tank CleaningSector: Domestic / Rural Water System The Challenge We were called
Location: BirminghamService: Ball Valve ReplacementSector: Residential / Apartment Block The Challenge During a routine service visit at a residential apartment
Location: Midlands (Apartment Block)Service: Booster Set Upgrade & ReplacementSector: Residential / Apartment Building The Challenge NT Cloke Pumps & Water
Location: BirminghamService: Booster Pump ReplacementSector: Residential / Apartment Block The Challenge NT Cloke Pumps & Water were called to a
Location: UK (Severn Trent Project Site)Service: Booster Set Upgrade & ReplacementSector: Industrial / Water Infrastructure The Challenge NT Cloke Pumps
Location: Birmingham (School)Service: Heating Pump UpgradeSector: Education / School Facility The Challenge NT Cloke Pumps & Water were scheduled to
Location: UK (Office Block)Service: Heating Pump ReplacementSector: Commercial / Office Building The Challenge Our engineers were contacted after a heating
Location: LiverpoolService: Booster Set Upgrade & CAT 5 Water Tank InstallationSector: Residential / Apartment Block The Challenge Our engineers were