Helping a global hotel group with their pumps
A team of our engineers have been busy helping a Global hotel group with their pumps
The fault…
A power surge caused two inverters to completely fail and cease working with another again failing, becoming non-operational.
A BITE SIZED CASE STUDY
CUSTOMER
Beauchamp College, Leicester
PROBLEM
The college recently had new boilers and found that the heating pumps were faulty and faulty valves to pumps.
SOLUTION
We went to site to find a solution to there heating issue. Spec up new invertor driven energy saving pumps to give the customer saving on their energy bills
BENEFIT
The pump will now perform better, which saves energy and as a result of our great work we now service this pump annually
The fix…
- Sourced three new inverters
- Change out failing units
- Installed new
- Test and commission new inverters
This booster set was soon working once again with the hotel very happy with the work of our team
Gallery
You may also like
After an emergency call-out for loss of water supply at a Birmingham apartment block, NT Cloke Pumps & Water installed a temporary bypass to keep
NT Cloke Pumps & Water cleaned and chlorinated the cold water storage tank at a commercial office building in South West London, removing sediment, disinfecting
NT Cloke Pumps & Water replaced an obsolete, repeatedly faulting control panel on a three-pump booster set at a Frimley apartment block. A new NTC
NT Cloke Pumps & Water completed a twin booster pump replacement, installing two new Grundfos vertical multistage pumps. The project included removal of the existing
NT Cloke Pumps & Water replaced a continuously running booster pump with a modern DAB twin booster system at a country house. Our engineers also
NT Cloke Pumps & Water successfully repaired a failed booster pump by replacing its motor and mechanical seal. Discover how our engineers restored the existing
NT Cloke Pumps & Water completed cold water storage tank cleaning, chlorination and booster pump servicing at a residential apartment block in Coventry, supporting water
NT Cloke Pumps & Water completed rainwater harvesting system maintenance at an industrial factory in Liverpool, including tank cleaning, sediment removal, chlorination and booster equipment
NT Cloke Pumps & Water completed comprehensive cold water storage tank cleaning and chlorination at a Nottingham healthcare facility, removing accumulated staining and deposits to
NT Cloke Pumps & Water completed routine servicing of a twin pump cold water booster set at a Central London healthcare facility, helping maintain reliable
During a scheduled cold water storage tank clean and chlorination, NT Cloke engineers identified a heavily corroded and broken inlet float valve. A temporary repair
During routine servicing at a Leicester city centre apartment block, NT Cloke Pumps & Water identified a failed non-return valve within a twin cold water