Installation of a pressure booster set
Apartment block, Liverpool
Challenge of this project was …
1. The booster set we were called to remove was a monster!
2. The job was scheduled within a specific time slot, as this set was feeding 4 x apartment blocks!
The solution
- This big old fixed speed unit was removed and an energy efficient set was installed.
- As always, our team delivered on time and with minimal disruption as agreed with our client.
Something worth mentioning here…
A huge benefit to this install
- This set now has more flow and pressure whilst making significant savings on energy.
- At a time with the cost of energy at an all time high for businesses, this solution will make a huge difference in the long run
Is your business or property you manage looking at ways to reduce cost on energy?
Get in touch with one of our team today to plan a visit to inspect your pumps!
Gallery




