Replacement of 3 large booster sets in london

Today we are taking a look back on a big project our team completed in Central London

This was the replacement of x3 large booster sets!

This was a challenging job due the limited time we were able to work with the water off during the day.

Our team had 3 days to remove the 3 faulty boosters and replace with the new Grundfos Engineering units.

Old boosters removed and isolated to system, new booster install in 4 inch copper pressfit.

All 3 boosters installed in good time and looks very good if we do say so ourselves.

Another professional job completed to tight timescales, so no matter what your requirements areā€¦NT Cloke Pumps & Water have you covered!