Student accomodation, Leeds
Our engineers have been working their magic once again!
We were called in to support a busy student accommodation block in Leeds
The problem….
After a failed weld on a big pump, there was a water leak that caused some serious concerns.
The solution (to call us of course)
Our team quickly arrived into Leeds and began to strip down the pump and installed a new bottom to the pump.
Typically the size and weight would be an issue, but not for our engineers who came equipped to be able to supply a quick fix to this pump which meant there was minimal downtime for all residents living within this building!
Great job lads and once again we delivered for our client in a short space of time
0116 3735496
info@ntclokepumpsandwater.co.uk
www.ntclokepumpsandwater.co.uk
We support our clients across the UK
Gallery





You may also like
The Challenge NT Cloke Pumps & Water were called to a local school in Leicester following a fault on the
The Problem NT Cloke Pumps & Water were called to a major hotel in Birkenhead after a complete failure of
The Problem NT Cloke Pumps & Water were called to a school in Leicester following reports of a leak within
When a booster set inverter fails, maintaining a reliable water supply becomes a priority, particularly in environments such as schools
When a booster pump fails in a school environment, a fast and effective response is essential to maintain reliable water