Projects
Heating Pump Upgrade: Prioritising Efficiency in Care Homes
When the heating pumps at a local care home reached the end of their lifespan, the team at NT Cloke Pumps & Water sprang into action.
What made this project and our solution special:
Instead of just replacing like for like, the forward-thinking management opted for an eco-friendly solution: energy-efficient inverter-driven pumps.
Here’s what we did:
Outcome?
The care home’s heating system was promptly restored, ensuring a warm and comfortable environment for all residents.
In every task, our focus remains on timely solutions and embracing innovations that benefit our clients in the long run.
Gallery
You may also like
After an emergency call-out for loss of water supply at a Birmingham apartment block, NT Cloke Pumps & Water installed a temporary bypass to keep
NT Cloke Pumps & Water cleaned and chlorinated the cold water storage tank at a commercial office building in South West London, removing sediment, disinfecting
NT Cloke Pumps & Water replaced an obsolete, repeatedly faulting control panel on a three-pump booster set at a Frimley apartment block. A new NTC
NT Cloke Pumps & Water completed a twin booster pump replacement, installing two new Grundfos vertical multistage pumps. The project included removal of the existing
NT Cloke Pumps & Water replaced a continuously running booster pump with a modern DAB twin booster system at a country house. Our engineers also
NT Cloke Pumps & Water successfully repaired a failed booster pump by replacing its motor and mechanical seal. Discover how our engineers restored the existing
NT Cloke Pumps & Water completed cold water storage tank cleaning, chlorination and booster pump servicing at a residential apartment block in Coventry, supporting water
NT Cloke Pumps & Water completed rainwater harvesting system maintenance at an industrial factory in Liverpool, including tank cleaning, sediment removal, chlorination and booster equipment
NT Cloke Pumps & Water completed comprehensive cold water storage tank cleaning and chlorination at a Nottingham healthcare facility, removing accumulated staining and deposits to
NT Cloke Pumps & Water completed routine servicing of a twin pump cold water booster set at a Central London healthcare facility, helping maintain reliable
During a scheduled cold water storage tank clean and chlorination, NT Cloke engineers identified a heavily corroded and broken inlet float valve. A temporary repair
During routine servicing at a Leicester city centre apartment block, NT Cloke Pumps & Water identified a failed non-return valve within a twin cold water
