Projects
Noisy pump situation at a newly-built residential complex
What’s that? A noise complaint? We’re on it!
We were recently called out to investigate a rather noisy pump situation at a newly-built residential complex.
Upon arrival, we made a startling discovery – the tanks had been cleaned, but the previous engineer had forgotten to open the suction valves to the pumps before leaving!
Sadly, as a result, the pumps had been running without water, causing them to burn out. Not one, but two of them!
Fear not though, NT Cloke Pumps & Water to the rescue! We promptly ordered new pumps from our stock and made sure they were installed ASAP, saving the day (and the ears) of the new tenants.
With the booster set now running smoothly, the residents are all set to move in without a hitch.
A friendly reminder – here at NT Cloke, we offer the full pump package! From cleaning and chlorinating your tanks to servicing and commissioning your boosters, we’ve got you covered!
Gallery
You may also like
NT Cloke Pumps & Water completed a twin booster pump replacement, installing two new Grundfos vertical multistage pumps. The project included removal of the existing
NT Cloke Pumps & Water replaced a continuously running booster pump with a modern DAB twin booster system at a country house. Our engineers also
NT Cloke Pumps & Water successfully repaired a failed booster pump by replacing its motor and mechanical seal. Discover how our engineers restored the existing
NT Cloke Pumps & Water completed cold water storage tank cleaning, chlorination and booster pump servicing at a residential apartment block in Coventry, supporting water
NT Cloke Pumps & Water completed rainwater harvesting system maintenance at an industrial factory in Liverpool, including tank cleaning, sediment removal, chlorination and booster equipment
NT Cloke Pumps & Water completed comprehensive cold water storage tank cleaning and chlorination at a Nottingham healthcare facility, removing accumulated staining and deposits to
NT Cloke Pumps & Water completed routine servicing of a twin pump cold water booster set at a Central London healthcare facility, helping maintain reliable
During a scheduled cold water storage tank clean and chlorination, NT Cloke engineers identified a heavily corroded and broken inlet float valve. A temporary repair
During routine servicing at a Leicester city centre apartment block, NT Cloke Pumps & Water identified a failed non-return valve within a twin cold water
NT Cloke Pumps & Water completed a booster pump refurbishment in Haverhill, Suffolk, replacing a full bearing kit and installing a new pressure vessel. The
NT Cloke completed Lowara booster pump repairs at a Northampton care home, replacing worn mechanical seals and motors to restore reliable water pressure while avoiding
NT Cloke installed a low-level float switch at a countryside property to protect the existing booster pump system against dry running, reducing the risk of