Twin Pump Upgrade at a Distribution Centre: Keeping Logistics FlowingÂ
At a bustling distribution centre, our client identified that their pumps were nearing the end of their service life. Recognising the importance of consistent operations, they wisely decided on an upgrade.
Come the next scheduled shutdown, our dedicated team of engineers were on site. They efficiently removed the old pumps and seamlessly installed the new ones.
After installation, we didn’t just stop there. Our engineers ensured the new pumps were rigorously run and tested against the system, guaranteeing peak performance.
Yet another example of how NT Cloke Pumps & Water ensures business continuity with minimal downtime.
Projects
Twin Pump Upgrade at a Distribution Centre
You may also like
🚨 Challenge: Responding to an urgent call from an apartment block, our team discovered water supply issues stemming from two
Challenge Encountered: During a routine call at a Leicester apartment block, NT Cloke Pumps & Water discovered a leaking pump
Project Snapshot: Background: A local school faced significant issues with its heating system, which had not received maintenance in over
Project Snapshot: Background: Mechanical seals play a crucial role in the operation of pump systems, sealing the interface where the
Project Overview: NT Cloke Pumps & Water carried out significant upgrades at Lancaster Boys High School in Leicester during the
Project Overview: One of NT Cloke Pumps & Water’s experienced engineers, Kane, had a unique service call—an annual pump check
Project Summary: NT Cloke Pumps & Water responded promptly to an emergency at a Newcastle farm shop, where a pump’s
Project Overview: NT Cloke Pumps & Water successfully conducted an extensive water management operation at a residential block in Reading,
Project Overview: A crucial maintenance operation was performed by NT Cloke Pumps & Water at a school sports facility in
Project Background: NT Cloke Pumps & Water recently undertook a crucial maintenance project at a residential complex in Manchester, focusing
Project Background: NT Cloke Pumps & Water was called upon to address the failing booster set at a renowned hotel
We recently completed a tank cleaning and chlorination service at a large residential property in London. These services are essential,