Projects
30kW Onsite Bearing Change at a London High-Rise
Our team recently completed a bearing replacement at a 32-storey apartment block in London after reports of loud noise coming from one of the pumps.
▶️ Diagnosis & Planning
A site inspection revealed the top bearing on the 30kW pump motor had failed. We sourced the correct part and returned promptly to carry out the work.
▶️ What We Did
- Isolated the pump and safely dismantled the unit
- Removed the faulty bearing and replaced it with a new one
- Reassembled and tested the pump to confirm smooth, silent operation
🔇 The Result
The pump is now back in service with no noise issues—keeping the water system running quietly and efficiently for all residents.
You may also like
Location: LiverpoolService: Booster Set Upgrade & CAT 5 Water Tank InstallationSector: Residential / Apartment Block The Challenge Our engineers were
Location: UK (Commercial Site)Service: Bearing & Seal ReplacementSector: Commercial / Facilities Management The Challenge Our engineers were called to site
Location: Cardiff City CentreService: Non-Return Valve ReplacementSector: Hospitality / Commercial The Challenge Our engineers were called to a busy restaurant
The Challenge Our engineers were called to a student accommodation block in Birmingham following reports of a noisy pump within
Location: BirminghamService: Pump & Inverter ReplacementSector: Student Accommodation / Residential The Challenge Our engineers were called to a large student
Location: UK (Commercial Site)Service: Pump Inspection, Safe Removal & RepairSector: Commercial / Facilities Management The Challenge The client contacted us
The brief NT Cloke Pumps & Water were instructed to carry out a full tank clean and chlorination on Tanks
The Call On Boxing Day, our team received an urgent call from one of our existing customers reporting no water
The Call-Out NT Cloke Pumps & Water were contacted by a commercial client after they noticed their heating pump had
Location: UKService: Domestic Booster Pump Fault Diagnosis & RepairSystem: DAB ESYBOXSector: Residential The Challenge The homeowner contacted us after experiencing
Location: RAF Base (UK)Service: Pump CommissioningEquipment: Grundfos Pump SystemSector: Defence / Critical Infrastructure The Challenge NT Cloke Pumps & Water
Location: Multiple Local SitesService: Pressurisation Unit Upgrades & Heating System ChecksSector: Commercial / Public Buildings The Challenge As the colder