30kW Onsite Bearing Change at a London High-Rise
Our team recently completed a bearing replacement at a 32-storey apartment block in London after reports of loud noise coming from one of the pumps.
▶️ Diagnosis & Planning
A site inspection revealed the top bearing on the 30kW pump motor had failed. We sourced the correct part and returned promptly to carry out the work.
▶️ What We Did
- Isolated the pump and safely dismantled the unit
- Removed the faulty bearing and replaced it with a new one
- Reassembled and tested the pump to confirm smooth, silent operation








🔇 The Result
The pump is now back in service with no noise issues—keeping the water system running quietly and efficiently for all residents.
You may also like
The Challenge NT Cloke Pumps & Water were called to a local school in Leicester following a fault on the
The Problem NT Cloke Pumps & Water were called to a major hotel in Birkenhead after a complete failure of
The Problem NT Cloke Pumps & Water were called to a school in Leicester following reports of a leak within
When a booster set inverter fails, maintaining a reliable water supply becomes a priority, particularly in environments such as schools
When a booster pump fails in a school environment, a fast and effective response is essential to maintain reliable water