Projects
Ball Valve Replacement – Commercial Office, Nottingham
Location: Nottingham
Service: Ball Valve Replacement & System Recommissioning
Sector: Commercial / Property Management
The Challenge
Our engineers were called to a large commercial office complex in Nottingham following reports of continuous leaks and flooding within the plant room.
During the inspection, the team identified that the existing weighted Keraflo valve had failed — the mechanism was no longer shutting off the water supply once the tank reached capacity, causing repeated overflow and water damage.
Our Solution
To prevent further flooding, NT Cloke’s engineers:
- Removed the faulty Keraflo valve
- Supplied and installed a new drop-arm ball valve
- Fully reconnected, set and tested the system
This upgrade ensured the tank could once again regulate incoming flow safely and efficiently.
✅ Faulty valve removed
✅ New drop-arm ball valve installed
✅ System tested and fully operational
The Result
The new installation restored full functionality and flow control, eliminating the risk of flooding and giving the client peace of mind.
The plant room is now safe, compliant, and running efficiently — a simple but essential fix that prevented major disruption.
Why It Matters
A malfunctioning valve may seem like a small issue, but left unresolved it can lead to serious water damage, downtime, and costly repairs.
At NT Cloke Pumps & Water, we respond quickly to resolve leaks, replace worn parts, and restore systems before they escalate into major problems.
📞 Need urgent support?
Call 0116 373 5496 or visit www.ntclokepumpsandwater.co.uk
You may also like
The Challenge NT Cloke Pumps & Water were called to a local school in Leicester following a fault on the
The Problem NT Cloke Pumps & Water were called to a major hotel in Birkenhead after a complete failure of
The Problem NT Cloke Pumps & Water were called to a school in Leicester following reports of a leak within
When a booster set inverter fails, maintaining a reliable water supply becomes a priority, particularly in environments such as schools
When a booster pump fails in a school environment, a fast and effective response is essential to maintain reliable water
Commissioning is one of the most important stages of any mechanical installation. Even the highest-quality equipment will only perform as
Maintaining clean, safe water storage is essential for residential buildings. NT Cloke Pumps & Water recently attended a Birmingham apartment
Location: BirminghamClient: Large Leisure FacilityService: Mechanical Seal ReplacementSector: Commercial / Leisure The Challenge We were called to a large leisure
Location: BristolClient: University of BristolService: Booster Set Upgrade & Inverter ReplacementSector: Commercial / Education The Challenge We were called out
Location: Residential PropertyService: Tank Cleaning, Chlorination & Booster Set ServiceSector: Domestic The Challenge We were called to a residential property
Location: BirminghamService: Circulator Pump ReplacementSector: Commercial / Hotel The Challenge We were called to a hotel in Birmingham experiencing reduced
Location: Birmingham City CentreService: Booster Set UpgradeSector: Residential Apartment Block The Challenge We were called to an apartment block in