Projects
Out-of-Hours Panel Replacement – NHS Hospital, Midlands
Location: Midlands
Service: Control Panel Replacement
Sector: Healthcare / NHS
The Challenge
When a faulty control panel began affecting the water supply at an NHS hospital, immediate action was required to avoid any disruption to patient care and essential services. With hospitals operating 24/7, timing was critical — meaning this job had to be completed out of hours with precision and planning.
Our Solution
Our engineers attended promptly, isolating the system at 4:30am to ensure no interruption to hospital operations. The entire control panel was replaced, tested, and recommissioned before staff and patients began their day — all completed safely, efficiently, and without incident.
The Result
The new control panel restored full operational control of the water system, ensuring reliability and compliance across the site. The hospital’s facilities team praised the speed, professionalism, and minimal disruption achieved during the out-of-hours works.
✅ Rapid out-of-hours response
✅ Complete control panel replacement
✅ Zero disruption to hospital operations
✅ Fully tested and recommissioned system
Trusted Support for Critical Environments
From hospitals to data centres and large commercial buildings, NT Cloke Pumps & Water provides specialist out-of-hours and emergency support to keep vital systems running.
Our engineers combine technical expertise with planning and precision — ensuring every client, no matter how complex their site, stays operational and compliant.
Contact our expert team for reliable support 24/7.
You may also like
Location: BirminghamClient: Large Leisure FacilityService: Mechanical Seal ReplacementSector: Commercial / Leisure The Challenge We were called to a large leisure
Location: BristolClient: University of BristolService: Booster Set Upgrade & Inverter ReplacementSector: Commercial / Education The Challenge We were called out
Location: Residential PropertyService: Tank Cleaning, Chlorination & Booster Set ServiceSector: Domestic The Challenge We were called to a residential property
Location: BirminghamService: Circulator Pump ReplacementSector: Commercial / Hotel The Challenge We were called to a hotel in Birmingham experiencing reduced
Location: Birmingham City CentreService: Booster Set UpgradeSector: Residential Apartment Block The Challenge We were called to an apartment block in
Location: Rural Property, ChippenhamService: Tank Cleaning, Chlorination & Booster Set ServiceSector: Domestic / Rural Water System The Challenge We attended
Location: Rural Property / FarmhouseService: Pump Installation & Tank CleaningSector: Domestic / Rural Water System The Challenge We were called
Location: BirminghamService: Ball Valve ReplacementSector: Residential / Apartment Block The Challenge During a routine service visit at a residential apartment
Location: Midlands (Apartment Block)Service: Booster Set Upgrade & ReplacementSector: Residential / Apartment Building The Challenge NT Cloke Pumps & Water
Location: BirminghamService: Booster Pump ReplacementSector: Residential / Apartment Block The Challenge NT Cloke Pumps & Water were called to a
Location: UK (Severn Trent Project Site)Service: Booster Set Upgrade & ReplacementSector: Industrial / Water Infrastructure The Challenge NT Cloke Pumps
Location: Birmingham (School)Service: Heating Pump UpgradeSector: Education / School Facility The Challenge NT Cloke Pumps & Water were scheduled to