Projects
Tank Clean and Chlorination at a London Residential Property
Project Overview: NT Cloke Pumps & Water recently undertook a crucial tank cleaning and chlorination project at a residential property in London. The homeowner had not addressed the water tank since moving in three years prior, leading to a situation of stagnant water that posed potential health risks.
Challenge: The main challenge was the condition of the water tank, which had been completely isolated from the home’s water system, resulting in stagnant water. This not only risked the health of the residents due to potential bacterial growth but also threatened the overall efficiency and safety of the water supply system.
Solution: Our team conducted a thorough cleaning and chlorination of the tank. The process involved:
- Initial Assessment: Evaluating the condition of the tank and the extent of stagnation.
- Cleaning Process: Removing debris and contaminants that had accumulated over time.
- Chlorination Treatment: Applying appropriate chlorination techniques to sanitise the water and tank surfaces.
- Water Quality Testing: Ensuring the water met health and safety standards before reintegrating the tank with the house’s water system.




Results: The transformation was significant, as evidenced by our before and after photos which clearly illustrated the necessity of regular maintenance. Post-cleanup, the water quality tests confirmed the safety and compliance of the system, ready to be brought back into regular use without any health risks.
Conclusion: This project highlights the hidden dangers of neglecting water tanks and underscores the importance of regular professional cleaning and chlorination. NT Cloke Pumps & Water ensures that residential properties like this one in London maintain optimal water hygiene and system efficiency, preventing potential health hazards and extending the longevity of the water systems.
You may also like
Location: LiverpoolService: Booster Set Upgrade & CAT 5 Water Tank InstallationSector: Residential / Apartment Block The Challenge Our engineers were
Location: UK (Commercial Site)Service: Bearing & Seal ReplacementSector: Commercial / Facilities Management The Challenge Our engineers were called to site
Location: Cardiff City CentreService: Non-Return Valve ReplacementSector: Hospitality / Commercial The Challenge Our engineers were called to a busy restaurant
The Challenge Our engineers were called to a student accommodation block in Birmingham following reports of a noisy pump within
Location: BirminghamService: Pump & Inverter ReplacementSector: Student Accommodation / Residential The Challenge Our engineers were called to a large student
Location: UK (Commercial Site)Service: Pump Inspection, Safe Removal & RepairSector: Commercial / Facilities Management The Challenge The client contacted us
The brief NT Cloke Pumps & Water were instructed to carry out a full tank clean and chlorination on Tanks
The Call On Boxing Day, our team received an urgent call from one of our existing customers reporting no water
The Call-Out NT Cloke Pumps & Water were contacted by a commercial client after they noticed their heating pump had
Location: UKService: Domestic Booster Pump Fault Diagnosis & RepairSystem: DAB ESYBOXSector: Residential The Challenge The homeowner contacted us after experiencing
Location: RAF Base (UK)Service: Pump CommissioningEquipment: Grundfos Pump SystemSector: Defence / Critical Infrastructure The Challenge NT Cloke Pumps & Water
Location: Multiple Local SitesService: Pressurisation Unit Upgrades & Heating System ChecksSector: Commercial / Public Buildings The Challenge As the colder







