Projects
Tank Clean, Chlorination & Ball Valve Replacement – Central London
Client: Private Residence
Location: Central London
Service: Water Tank Clean, Chlorination & Ball Valve Replacement
Industry: Residential / Landlord Services
The Challenge
During a scheduled tank clean and chlorination at a private Central London property, our engineers identified a faulty ball valve. Though often overlooked, a failing valve can lead to constant overflow, bacterial stagnation, and even system pressure issues.
Our Solution
NT Cloke carried out a comprehensive water hygiene service, including:
- ✅ Full tank clean and chlorination
- ✅ Replacement of faulty ball valve
- ✅ Water sample taken for lab testing
- ✅ System fully recommissioned for safe operation
All works were completed in one visit, with minimal disruption to the client.
Why It Matters
🔹 Prevents overflow and water waste
🔹 Reduces risk of Legionella and other bacteria
🔹 Protects plumbing and pump systems from strain
🔹 Keeps your property safe, compliant, and efficient
NT Cloke provides full-system care — not just tank hygiene, but also valve checks, pump servicing, and compliance testing — all under one roof.
You may also like
Location: Midlands (Apartment Block)Service: Booster Set Upgrade & ReplacementSector: Residential / Apartment Building The Challenge NT Cloke Pumps & Water
Location: BirminghamService: Booster Pump ReplacementSector: Residential / Apartment Block The Challenge NT Cloke Pumps & Water were called to a
Location: UK (Severn Trent Project Site)Service: Booster Set Upgrade & ReplacementSector: Industrial / Water Infrastructure The Challenge NT Cloke Pumps
Location: Birmingham (School)Service: Heating Pump UpgradeSector: Education / School Facility The Challenge NT Cloke Pumps & Water were scheduled to
Location: UK (Office Block)Service: Heating Pump ReplacementSector: Commercial / Office Building The Challenge Our engineers were contacted after a heating
Location: LiverpoolService: Booster Set Upgrade & CAT 5 Water Tank InstallationSector: Residential / Apartment Block The Challenge Our engineers were
Location: UK (Commercial Site)Service: Bearing & Seal ReplacementSector: Commercial / Facilities Management The Challenge Our engineers were called to site
Location: Cardiff City CentreService: Non-Return Valve ReplacementSector: Hospitality / Commercial The Challenge Our engineers were called to a busy restaurant
The Challenge Our engineers were called to a student accommodation block in Birmingham following reports of a noisy pump within
Location: BirminghamService: Pump & Inverter ReplacementSector: Student Accommodation / Residential The Challenge Our engineers were called to a large student
Location: UK (Commercial Site)Service: Pump Inspection, Safe Removal & RepairSector: Commercial / Facilities Management The Challenge The client contacted us
The brief NT Cloke Pumps & Water were instructed to carry out a full tank clean and chlorination on Tanks