We recently carried out a planned booster set upgrade at a care home, ensuring everything was completed within a tight timeframe to reduce disruption for residents and staff.

🛠️ Site Assessment & Preparation
Our team measured up during the initial visit and had a new booster system built to specification—ready for quick installation.

⏱️ Precise Execution

  • Water supply turned off at 9:00am after breakfast
  • New booster set installed
  • Water fully restored before lunch at 12:00pm

The job was completed on time, with zero impact on daily care routines.

End Result
A brand-new, efficient booster system now supports the property—installed with care, speed and minimal downtime.