Projects
Booster Set Upgrade – Severn Trent Process System Protected
Location: UK (Severn Trent Project Site)
Service: Booster Set Upgrade & Replacement
Sector: Industrial / Water Infrastructure
The Challenge
NT Cloke Pumps & Water were contacted by Severn Trent to support with the upgrade of a failing booster set that had become critical to the site’s operation.
The existing system had reached the end of its service life and was no longer providing the reliability required for the process. The booster set plays a vital role in clearing mine water and supporting the wider system, acting as a key component in maintaining the site’s operational performance.
A secondary booster is used to keep pump chambers clean and protect pump seals, meaning the reliability of the system is essential to prevent operational issues and potential downtime.
Due to the importance of the process, the entire changeover needed to be completed within a strict 24-hour window.
Our Solution
Following a detailed site visit and system assessment, our team designed and built a brand-new bespoke booster set skid alongside our trusted pump suppliers.
The new system was built to match the operational requirements of the site while improving reliability and overall performance.
Our engineers then attended site to carry out the full installation, removing the old booster set and installing the newly designed system. Mechanical and electrical connections were completed before the system was fully commissioned and tested.
All works were delivered within the required timeframe to ensure the site’s process remained protected and fully operational.
The Result
The booster set upgrade was successfully completed within the 24-hour changeover window, restoring reliability to a critical system and ensuring the process remained protected.
- Failing booster set removed and upgraded system installed
- Bespoke booster set skid designed and built
- Mechanical and electrical installation completed
- System fully commissioned and operational within 24 hours
Why It Matters
Booster sets play a vital role in maintaining pressure, protecting equipment and supporting critical processes across industrial and infrastructure environments. When these systems fail or become unreliable, the consequences can quickly affect wider operations.
NT Cloke Pumps & Water support industrial, commercial and infrastructure sites with bespoke pump solutions — from system upgrades and replacements to fully designed and built booster sets.
Our team manages projects from initial surveys through to design, installation and commissioning, ensuring reliable systems that keep operations running when they matter most.
📞 0116 373 5496
📧 info@ntclokepumpsandwater.co.uk
You may also like
Location: BirminghamClient: Large Leisure FacilityService: Mechanical Seal ReplacementSector: Commercial / Leisure The Challenge We were called to a large leisure
Location: BristolClient: University of BristolService: Booster Set Upgrade & Inverter ReplacementSector: Commercial / Education The Challenge We were called out
Location: Residential PropertyService: Tank Cleaning, Chlorination & Booster Set ServiceSector: Domestic The Challenge We were called to a residential property
Location: BirminghamService: Circulator Pump ReplacementSector: Commercial / Hotel The Challenge We were called to a hotel in Birmingham experiencing reduced
Location: Birmingham City CentreService: Booster Set UpgradeSector: Residential Apartment Block The Challenge We were called to an apartment block in
Location: Rural Property, ChippenhamService: Tank Cleaning, Chlorination & Booster Set ServiceSector: Domestic / Rural Water System The Challenge We attended
Location: Rural Property / FarmhouseService: Pump Installation & Tank CleaningSector: Domestic / Rural Water System The Challenge We were called
Location: BirminghamService: Ball Valve ReplacementSector: Residential / Apartment Block The Challenge During a routine service visit at a residential apartment
Location: Midlands (Apartment Block)Service: Booster Set Upgrade & ReplacementSector: Residential / Apartment Building The Challenge NT Cloke Pumps & Water
Location: BirminghamService: Booster Pump ReplacementSector: Residential / Apartment Block The Challenge NT Cloke Pumps & Water were called to a
Location: Birmingham (School)Service: Heating Pump UpgradeSector: Education / School Facility The Challenge NT Cloke Pumps & Water were scheduled to
Location: UK (Office Block)Service: Heating Pump ReplacementSector: Commercial / Office Building The Challenge Our engineers were contacted after a heating