Control Panel Failure – College Site
Location: UK College (Confidential Site)
Service: Control Panel Repair & System Assessment
Sector: Education
The Challenge
NT Cloke were called to a college site following a sudden power surge that caused significant damage to the PCBs in their old Grundfos control panel. With the unit now obsolete and replacement parts unavailable, the college faced a total loss of water pressure to key areas on site.
Our Solution
Our engineers acted fast to restore supply.
They temporarily set Pump No.1 as a single pump, re-wired the transducer directly into the inverter, and successfully restored the water system to operational status. This provided an immediate fix, allowing the site to function while we prepared a long-term solution.
The Result
Water supply was restored the same day, minimising disruption for staff and students.
Next, we’ll be offering two future-proof options — either a new control panel compatible with existing inverters, or a complete booster set replacement to deliver enhanced reliability and energy efficiency.
✅ Emergency response and fault diagnosis
✅ Temporary repair completed on site
✅ Long-term upgrade options provided






Keeping Systems Running, Whatever the Make or Model
Installed back in 2006, this system has certainly served its time — and thanks to our multi-skilled, manufacturer-trained engineers, NT Cloke can repair, upgrade, or replace any control panel or booster system to keep your building operational.
Contact our team today for expert support.