Projects
18,000L Tank Clean & Chlorination – Hospital in the Midlands
Location: Midlands
Service: 18,000L Split Tank Clean & Chlorination
Sector: Healthcare / NHS
The Challenge
NT Cloke Pumps & Water were called by a new client at a hospital in the Midlands to carry out a full tank clean and chlorination on their 18,000-litre split cold-water storage system.
In healthcare environments, maintaining water hygiene is critical — not just for compliance, but for patient safety and infection control.
Our Solution
Our engineers performed a complete clean, chlorination and inspection of both split tanks, ensuring every section of the system met hygiene and compliance standards.
The works included:
- Deep clean and chlorination of both tanks
- Visual inspection of all internal surfaces and fittings
- Flushing and disinfection of associated pipework
- Post-clean water sampling for validation
- Full certification and compliance documentation
✅ 18,000L split tank cleaned and chlorinated
✅ Sampling confirmed safe, compliant water
✅ Hospital system protected against bacterial growth
The Result
The hospital now benefits from a fully disinfected, safe and compliant water system, reducing the risk of Legionella and ensuring patient care can continue without disruption.
Another critical healthcare site now trusts NT Cloke to maintain its water hygiene and compliance schedule — where reliability and attention to detail make all the difference.
Why It Matters
For hospitals and healthcare facilities, water hygiene isn’t just maintenance — it’s protection for patients, staff and visitors.
At NT Cloke Pumps & Water, we deliver trusted, nationwide water hygiene services for healthcare, commercial and public sector clients — helping them stay compliant, safe and operational.
📞 Schedule your next tank clean:
0116 373 5496 | info@ntclokepumpsandwater.co.uk
🌐 www.ntclokepumpsandwater.co.uk
You may also like
Location: BirminghamClient: Large Leisure FacilityService: Mechanical Seal ReplacementSector: Commercial / Leisure The Challenge We were called to a large leisure
Location: BristolClient: University of BristolService: Booster Set Upgrade & Inverter ReplacementSector: Commercial / Education The Challenge We were called out
Location: Residential PropertyService: Tank Cleaning, Chlorination & Booster Set ServiceSector: Domestic The Challenge We were called to a residential property
Location: BirminghamService: Circulator Pump ReplacementSector: Commercial / Hotel The Challenge We were called to a hotel in Birmingham experiencing reduced
Location: Birmingham City CentreService: Booster Set UpgradeSector: Residential Apartment Block The Challenge We were called to an apartment block in
Location: Rural Property, ChippenhamService: Tank Cleaning, Chlorination & Booster Set ServiceSector: Domestic / Rural Water System The Challenge We attended
Location: Rural Property / FarmhouseService: Pump Installation & Tank CleaningSector: Domestic / Rural Water System The Challenge We were called
Location: BirminghamService: Ball Valve ReplacementSector: Residential / Apartment Block The Challenge During a routine service visit at a residential apartment
Location: Midlands (Apartment Block)Service: Booster Set Upgrade & ReplacementSector: Residential / Apartment Building The Challenge NT Cloke Pumps & Water
Location: BirminghamService: Booster Pump ReplacementSector: Residential / Apartment Block The Challenge NT Cloke Pumps & Water were called to a
Location: UK (Severn Trent Project Site)Service: Booster Set Upgrade & ReplacementSector: Industrial / Water Infrastructure The Challenge NT Cloke Pumps
Location: Birmingham (School)Service: Heating Pump UpgradeSector: Education / School Facility The Challenge NT Cloke Pumps & Water were scheduled to