The Challenge

NT Cloke Pumps & Water received an emergency call-out after a complete loss of water supply across a four-block student accommodation site, affecting hundreds of residents. On arrival, we found an ageing and heavily modified booster set riddled with faults, along with outdated fusion-welded plastic pipework.

Our Emergency Response

  • Quickly dispatched an available engineer to the site
  • Assessed the faulty booster system
  • Temporarily restored water by getting 2 out of 4 pumps operational
  • Carried out a full inspection and provided recommendations for a new booster set and complete pipework upgrade

The Long-Term Solution

After consultation, the client approved a full system upgrade. We designed and installed:

  • A Triple Pump Booster Set with improved reliability and performance
  • Copper press-fit pipework, chosen for durability and future serviceability
  • Full mechanical and electrical installation, including insulation and commissioning
  • A temporary bypass during works to minimise water downtime

Results

✅ Reliable water pressure restored for all accommodation blocks
✅ Safer, more maintainable copper pipework installed
✅ Outdated system fully replaced and futureproofed
✅ Minimal disruption to site operations

NT Cloke is proud to provide fast, expert solutions under pressure — from emergency response to full system design and upgrades.