Emergency Booster Set & Pipework Upgrade – Student Accommodation
Client: Multi-Block Student Accommodation
Location: UK (Undisclosed)
Service: Emergency Booster Set Replacement & Pipework Upgrade
Industry: Education / Residential Housing
The Challenge
NT Cloke Pumps & Water received an emergency call-out after a complete loss of water supply across a four-block student accommodation site, affecting hundreds of residents. On arrival, we found an ageing and heavily modified booster set riddled with faults, along with outdated fusion-welded plastic pipework.
Our Emergency Response
- Quickly dispatched an available engineer to the site
- Assessed the faulty booster system
- Temporarily restored water by getting 2 out of 4 pumps operational
- Carried out a full inspection and provided recommendations for a new booster set and complete pipework upgrade
The Long-Term Solution
After consultation, the client approved a full system upgrade. We designed and installed:
- A Triple Pump Booster Set with improved reliability and performance
- Copper press-fit pipework, chosen for durability and future serviceability
- Full mechanical and electrical installation, including insulation and commissioning
- A temporary bypass during works to minimise water downtime
Results
✅ Reliable water pressure restored for all accommodation blocks
✅ Safer, more maintainable copper pipework installed
✅ Outdated system fully replaced and futureproofed
✅ Minimal disruption to site operations
NT Cloke is proud to provide fast, expert solutions under pressure — from emergency response to full system design and upgrades.
You may also like
The Challenge NT Cloke Pumps & Water were called to a local school in Leicester following a fault on the
The Problem NT Cloke Pumps & Water were called to a major hotel in Birkenhead after a complete failure of
The Problem NT Cloke Pumps & Water were called to a school in Leicester following reports of a leak within
When a booster set inverter fails, maintaining a reliable water supply becomes a priority, particularly in environments such as schools
When a booster pump fails in a school environment, a fast and effective response is essential to maintain reliable water
Commissioning is one of the most important stages of any mechanical installation. Even the highest-quality equipment will only perform as
Maintaining clean, safe water storage is essential for residential buildings. NT Cloke Pumps & Water recently attended a Birmingham apartment
Location: BirminghamClient: Large Leisure FacilityService: Mechanical Seal ReplacementSector: Commercial / Leisure The Challenge We were called to a large leisure
Location: BristolClient: University of BristolService: Booster Set Upgrade & Inverter ReplacementSector: Commercial / Education The Challenge We were called out
Location: Residential PropertyService: Tank Cleaning, Chlorination & Booster Set ServiceSector: Domestic The Challenge We were called to a residential property
Location: BirminghamService: Circulator Pump ReplacementSector: Commercial / Hotel The Challenge We were called to a hotel in Birmingham experiencing reduced
Location: Birmingham City CentreService: Booster Set UpgradeSector: Residential Apartment Block The Challenge We were called to an apartment block in