A returning customer contacted us regarding issues with their 20+ year-old fixed-speed booster set, which we’ve proudly maintained for many years.
What We Found:
Two 11kW pumps failed — one with a damaged wet end causing grinding noises and loss of pressure, the other with a motor drawing over three times full load current.
Jockey pump NRV failure.
Control panel issues with obsolete components.
The Solution:
Given the ongoing problems and outdated equipment, the customer chose to upgrade to a new variable-speed booster set.
Key benefits:
- Increased energy efficiency
- Reduced operational costs
- Smaller footprint, freeing up valuable space
- Quieter operation
We supplied, fitted and commissioned the new set, completing all mechanical and electrical works. The system is now running perfectly — ready to serve the hotel for many more years.
Looking to upgrade your old systems? Contact NT Cloke Pumps & Water today
You may also like
Location: LiverpoolService: Booster Set Upgrade & CAT 5 Water Tank InstallationSector: Residential / Apartment Block The Challenge Our engineers were
Location: UK (Commercial Site)Service: Bearing & Seal ReplacementSector: Commercial / Facilities Management The Challenge Our engineers were called to site
Location: Cardiff City CentreService: Non-Return Valve ReplacementSector: Hospitality / Commercial The Challenge Our engineers were called to a busy restaurant
The Challenge Our engineers were called to a student accommodation block in Birmingham following reports of a noisy pump within
Location: BirminghamService: Pump & Inverter ReplacementSector: Student Accommodation / Residential The Challenge Our engineers were called to a large student
Location: UK (Commercial Site)Service: Pump Inspection, Safe Removal & RepairSector: Commercial / Facilities Management The Challenge The client contacted us
The brief NT Cloke Pumps & Water were instructed to carry out a full tank clean and chlorination on Tanks
The Call On Boxing Day, our team received an urgent call from one of our existing customers reporting no water
The Call-Out NT Cloke Pumps & Water were contacted by a commercial client after they noticed their heating pump had
Location: UKService: Domestic Booster Pump Fault Diagnosis & RepairSystem: DAB ESYBOXSector: Residential The Challenge The homeowner contacted us after experiencing
Location: RAF Base (UK)Service: Pump CommissioningEquipment: Grundfos Pump SystemSector: Defence / Critical Infrastructure The Challenge NT Cloke Pumps & Water
Location: Multiple Local SitesService: Pressurisation Unit Upgrades & Heating System ChecksSector: Commercial / Public Buildings The Challenge As the colder