Booster Set Replacement – Heathrow High-Rise

Booster Set Replacement – Heathrow High-Rise

Booster-Set-Replacement-Heathrow-High-Rise NT Cloke Pumps and Water

Location: Heathrow
Service: Booster Set Replacement
Sector: Commercial / High-Rise

The Challenge

NT Cloke were called to a high-rise building near Heathrow where the existing booster set was failing. The control system had stopped working, forcing the unit to run constantly on a single pump. This not only increased energy consumption but also risked total system failure.

Our Solution

Our engineers attended site, safely isolated the system, and completed a full booster set replacement. The new inverter-driven unit was installed, commissioned, and tested to ensure reliable performance and energy efficiency moving forward.

The Result

The new system now runs smoothly, automatically adjusting to demand — saving energy and reducing wear on components. The client can now enjoy consistent pressure, reduced costs, and peace of mind knowing their system is future-ready.

✅ Improved efficiency
✅ Energy savings from variable speed control
✅ Reliable pressure and automatic operation

Is Your Booster Set Due for Replacement?

If your system is showing signs of age or operating inefficiently, NT Cloke can specify, supply, and install a new booster set to meet your building’s exact needs.
Contact our team today for expert advice and installation.

You may also like