Case Studies

04 Sep

Project Overview: NT Cloke Pumps & Water was called to address a critical issue at a student accommodation block in

29 Aug

Background: An unexpected power cut at a Sheffield office block led to significant operational disruptions when two of the three

27 Aug

Overview: NT Cloke Pumps & Water recently demonstrated our technical expertise and versatility during a significant setup and commissioning event

21 Aug

Situation: When a high-priority client contacted NT Cloke Pumps & Water about a leak from a booster pump on the

20 Aug

Servicing Critical Pump Systems in Multiple Schools Client: Various Schools Across the County Why Regular Pump Servicing in Schools? Pumps

20 Aug

Successfully Commissioning Grundfos Circulator Pumps Client: Newly Developed Office Block About These Circulators This week, we successfully commissioned various sizes

20 Aug

Saving Potential Issues With an Annual Service at a Private Hospital Client: Spire Hospital The Challenge We were tasked with

15 Aug

Addressing Long-Standing Issues with a Booster Set Client: Office BlockLocation: [Location of the Office Block, if applicable] The Challenge Recently,

22 Jul

Overcoming Performance Challenges with an Outdated Booster System Client: Renowned High Street Department Store The Challenge The department store was

20 Jul

💧 Ensuring Clean and Safe Water at a Military Facility Client: Army Base 🚿 The Importance of Regular Maintenance Regular

20 Jul

Client: Multinational Gym The Challenge We were called to address a critical issue at a large gym, where their existing

04 Jun

Our NT Cloke team traveled up the M6 to Birmingham to address a technical issue at a student accommodation complex.