Case Studies

17 Sep

Project Overview: NT Cloke Pumps & Water undertook a significant upgrade of the heating system at a Leicester school during

12 Sep

Introduction: During one of the busiest seasons at NT Cloke Pumps & Water, the critical importance of regular water tank

10 Sep

Project Background: NT Cloke Pumps & Water was called to address urgent water pressure issues at a well-known London hotel.

06 Sep

Project Overview: At a key site in Cambridge, NT Cloke Pumps & Water embarked on an essential upgrade after identifying

04 Sep

Project Overview: NT Cloke Pumps & Water was called to address a critical issue at a student accommodation block in

29 Aug

Background: An unexpected power cut at a Sheffield office block led to significant operational disruptions when two of the three

27 Aug

Overview: NT Cloke Pumps & Water recently demonstrated our technical expertise and versatility during a significant setup and commissioning event

21 Aug

Situation: When a high-priority client contacted NT Cloke Pumps & Water about a leak from a booster pump on the

20 Aug

Servicing Critical Pump Systems in Multiple Schools Client: Various Schools Across the County Why Regular Pump Servicing in Schools? Pumps

20 Aug

Successfully Commissioning Grundfos Circulator Pumps Client: Newly Developed Office Block About These Circulators This week, we successfully commissioned various sizes

20 Aug

Saving Potential Issues With an Annual Service at a Private Hospital Client: Spire Hospital The Challenge We were tasked with

15 Aug

Addressing Long-Standing Issues with a Booster Set Client: Office BlockLocation: [Location of the Office Block, if applicable] The Challenge Recently,